How Much Do Bord Gáis Solar Panels Cost?

Typical installations range from approximately €4,000 to €12,000. Costs vary based on system customization for individual household needs. Pairing solar panels with a Bord Gáis smart meter plan can help you maximise savings by exporting surplus energy during off-peak hours.

Factors affecting total cost:

  • System Size (Number of Panels): Larger systems generate more long-term savings
  • Household Energy Consumption: Usage determines recommended kilowatt peak (kWp)
  • Roof Type and Orientation: Complexity and sun exposure impact installation expenses
  • Supplementary Works: Additional electrical or structural work increases price
  • Additional Components: Battery storage systems add €1,700–€2,500

Compare Energy Plans and Save Today!

Our energy experts at Selectra compare all 11 Irish suppliers to find you the best rate — completely free and with no obligation.

Ad - Selectra Service
This is a free call from Ireland. Selectra agents can assist you with comparing and switching energy providers on weekdays between 9 am and 5.30 pm.

How Do I Get a Bord Gáis Solar Panel Consultation?

Contact methods:

  1. Website submission via Bord Gáis Energy Solar Hub
  2. Phone: (01) 611 0151 — Monday–Friday: 8am–8pm, Saturdays: 9am–5:30pm (see all channels on our contact page)

Process steps:

  • Initial Phone Call: Discussion of energy usage, roof characteristics, goals
  • Free Home Survey: No-obligation physical assessment of dimensions, orientation, shading, electrical setup
  • Bespoke Proposal: Customized proposal with system details, savings estimates, costs, and SEAI grant information

How Does the Bord Gáis Solar Panel Installation Work?

  1. Contact and Consultation: Preliminary assessment of energy needs and home suitability
  2. Detailed Site Survey: Precise roof measurements, angle evaluation, orientation assessment, shading analysis
  3. Design & Quotation: Detailed proposal with system recommendation, electricity generation estimates, projected savings, full cost breakdown
  4. Grant Application (SEAI): Guidance through SEAI Solar PV Grant process
  5. ESB Networks Application: Application handling for grid connection approval
  6. Installation: SEAI-registered team installation typically taking 1–2 days
  7. Post-Installation & Handover: System monitoring instruction and BER assessment for grant access

How Do Bord Gáis Solar Panels Compare to Other Providers?

Key comparison areas: Certifications, product quality, pricing transparency, microgeneration rates. For a detailed look at current Bord Gáis tariffs, see our Bord Gáis Energy rates page.

How Do Bord Gáis Solar Panels Compare to Other Providers comparison table
Provider Typical System Cost Range Current CEG Rate Key Notes
Bord Gáis €8,000–€10,000 18.5c/kWh €400 discount on custom installations; reliable end-to-end service
Electric Ireland €7,000–€10,000+ 19.5c/kWh Large customer base; emphasis on process ease
Energia €7,500–€11,000+ 18.5c/kWh Comprehensive “One Stop Shop” service
SSE Airtricity €7,500–€10,900+ 19.5c/kWh Strong sustainable retrofitting focus
Pinergy Varies by partner 25.0c/kWh Highest microgen rate; smart-meter focused
Independent Installers €6,000–€9,000 Varies by supplier Lower overheads; verify SEAI registration

Last Updated: March 2026

Compare Energy Plans and Save Today!

Our energy experts at Selectra compare all 11 Irish suppliers to find you the best rate — completely free and with no obligation.

Ad - Selectra Service
This is a free call from Ireland. Selectra agents can assist you with comparing and switching energy providers on weekdays between 9 am and 5.30 pm.

Are There Grants for Bord Gáis Solar Panels?

As an SEAI-registered installer, Bord Gáis qualifies customers for current SEAI solar panel grant schemes.

Are There Grants for Bord Gáis Solar Panels comparison table
Kilowatt Peak (kWp) Grant Amount
1 kWp €700
2 kWp €1,400
3 kWp €1,600
4 kWp (Capped) €1,800

Grants cover both labour and materials. The grant does not cover repairs or battery storage, and eligibility is limited to once per property.

Grant Amount Capped 2026: The €1,800 cap remains in place for 2026 to support renewable transition, despite previous reduction announcements.

Are There Other Ways to Reduce the Costs of My Bord Gáis Solar Panels?

Are There Other Ways to Reduce the Costs of My Bord Gáis Solar Panels comparison table
Incentive Description Value Key Notes
VAT Reduction Government initiative for solar installations 0% VAT Applied directly by installer to total cost
Bord Gáis Promotional Offer Direct discount on solar installations €400 discount Available for custom home installations
Tax Exemption for CEG Tax-free income from excess energy sales Up to €400/year Extended for microgenerators until Dec 2030
Fully Funded Panels Scheme for medically vulnerable households 100% funded Criteria apply (Priority Services Register)
TAMS Grants Solar PV grants for farms and agriculture Up to 60% Capped at €90,000 via IFA partnership

Last Update: March 2026

Bord Gáis Solar Panels Promotional Offer: Currently offering €400 discount on custom home installations when booking free consultation through their online hub.

Compare Energy Plans and Save Today!

Our energy experts at Selectra compare all 11 Irish suppliers to find you the best rate — completely free and with no obligation.

Ad - Selectra Service
This is a free call from Ireland. Selectra agents can assist you with comparing and switching energy providers on weekdays between 9 am and 5.30 pm.

What Are the Pros and Cons of Bord Gáis Solar Panels?

Advantages

  • Trusted Provider: Well-established major Irish energy company
  • SEAI Registered: Ensures high industry standards and government grant eligibility
  • Microgeneration Support: Competitive Clean Export Guarantee rate for grid exports
  • Incentives & Offers: Assistance navigating grant processes and 0% VAT application
  • End-to-End Service: Complete process management from consultation to installation

Disadvantages

  • Potentially Higher Cost: Sometimes higher pricing than independent solar installers
  • Customer Service Concerns: Some reviews mention customer service issues
  • Less Flexibility: Solutions may be more standardized than specialized companies offer
  • Reliance on Subcontractors: Some customers prefer avoiding subcontracted installation teams
  • “Lock-in” Effect: Microgeneration buy-in may discourage provider switching

Frequently Asked Questions About Bord Gáis Energy Solar Panels

Bord Gáis estimates typical bill savings of €200–€300 annually. Combined with CEG export payments, total annual savings for standard households reach €600–€1,300+.
Yes. Panels rely on daylight, not direct sunlight. Long summer days provide excellent generation, and modern panels produce electricity on cloudy days.
Batteries are optional but recommended for maximizing self-consumption. They store energy for nighttime use, reducing grid reliance. Adding €1,700–€2,500 to costs, they significantly accelerate return on investment.
Most customers see payback in 5–8 years. Higher energy users and battery storage customers typically see quickest returns.
Typical offerings include 25-year panel performance warranty, 2-year workmanship warranty, and 10-year manufacturer inverter warranty. Current Microgen Export Plan pays 18.5c per kWh for grid exports.
Bord Gáis Energy logo

Rate your experience with Bord Gáis Energy

Click a star to leave a review

Bord Gáis Energy logo

Rate Bord Gáis Energy

Verified reviews only

Thank you for your review!

A verification email has been sent. Your review will be published after confirmation.

Your rating *

/50 characters minimum

A verification link will be sent — never published